1-27-09 Water tank project completed


Infini is back together again. All the tools and supplies have been stored away, and everything's been vacuumed and cleaned. With the upholstery back in place, we're back to our comfortable home. Overall, it took about two and a half weeks for this project, which must be record time, and we retained 115G capacity. THANKS FOR YOUR HELP RAMONE!! We still have a few things we want to do while we're here at the marina, before leaving back to the San Blas. Winds have been 15-20 from the N-NE, with seas running 6-9', so there are a handful of boats waiting for the winds to calm down before heading out. For those of you boat watchers out there, there's a 112' Swan (14' draft!) and a 86' Nordhavn (gorgeous paint job!) here at the marina, joining the other luxury yachts, sailboats and crews from all over the world who have stopped here.

No comments: